Spout Spring Branch at Buddy Hayes Park

Before

After

Before

During

The Watershed Conservation Resource Center (WCRC) successfully completed the project by designing, installing, and implementing effective Best Management Practices (BMPs) to ensure compliance with Arkansas Water Quality Standards. Throughout the project, BMPs were carefully selected and installed to minimize pollutant discharges while considering site-specific factors such as soil conditions, flow characteristics, the level of disturbance within the waterbody, and the designated use of the waterbody. Measures were also implemented to minimize channel and streambank erosion and scour in the immediate vicinity of the work area. These efforts helped protect water quality and stabilize the project area following completion.

Additional Photos

Before

During